First cars on Milos the Great highway: toll from September

Milos the Great highway from Obrenovac to Ljig, which was opened by the President of Serbia, Aleksandar Vučić, is being trafficed on with the first vehicles.

Izvor: B92

Wednesday, 21.08.2019.

10:46

First cars on Milos the Great highway: toll from September
Tanjug, Sava Radovanoviæ

First cars on Milos the Great highway: toll from September

The new highway’s length is 62,7km and is made of 3 sections: Obrenovac-Ub (26,23km), Ub-Lajkovac (12,5km) and Lajkovac-Ljig (23,98km).

Thus, with the Ljig-Preljina section, which was previously opened, 103,06km of the E-763 Belgrade-South Adriatic highway is in traffic.

Obrenovac-Ljig section was projected for speeds up to 130 km per hour, its width is 28,4 meters with fast, middle and stop lane; it has 42 bridges and overpasses, where the longest bridge is over 580 meters, which has 200km long repulsive fence for safety.

The E-763 highway is a branch of the Trans-European highway that connects its main route from Gdansk to Athens and Istanbul with the Adriatic Sea and the port of Bar.

Komentari 1

Pogledaj komentare

1 Komentari

Možda vas zanima

Podeli: